Cookies on the Gambling Commission website

The Gambling Commission website uses cookies to make the site work better for you. Some of these cookies are essential to how the site functions and others are optional. Optional cookies help us remember your settings, measure your use of the site and personalise how we communicate with you. Any data collected is anonymised and we do not set optional cookies unless you consent.

Set cookie preferences

You've accepted all cookies. You can change your cookie settings at any time.

Skip to main content

Standards

Bingo and casino technical requirements

Bingo and casino technical requirements under section 85 and section 89 of the Gambling Act 2005.

  1. Contents
  2. 3 - Part 2: Bingo technical requirements
  3. 5 - Wireless network systems - Bingo technical requirements

5 - Wireless network systems - Bingo technical requirements

Network coverage

5.1 If a gaming device is designed to allow players to participate using a wireless network the following must be complied with:
a. unless denoted by clear signage, there must be no areas where players may participate in any gambling using such a device where the communication signal is not available or of poor quality such that interruptions in play would be likely
b.there must be adequate wireless coverage so that the failure of a single transmitter does not significantly reduce the players’ ability to participate in the game. This does not prohibit the use of a single transmitter.

Network failure

5.2 Where a network failure occurs:

a. all devices must alert the player of the failure as soon as it is possible to do so. It is permissible for the device to continue with any game if the network connection is restored provided that the player is not disadvantaged in any way
b. a manual alternative method of play (for example, keying in game outcome or other element as opposed to an automatic download via wireless network) is permissible where there is no disadvantage to the player and where there is adequate time to do so. Catch up facilities for example, button pressed to bring device up to current position within game may be used where the game that was in play when the network failure occurred has not been completed.

Communication requirements

5.3 All protocols must use communication techniques that have proper error detection and, or as well as, recovery mechanisms which are designed to prevent unauthorized access or tampering, employing Data Encryption Standards (DES) or equivalent encryption with secure seeds or algorithms.

Power level display requirements

5.4 Portable devices must give warnings when the battery life of the device reaches a low level.

Audit requirements

5.5 An audit log of sufficient time stamping of significant events must be maintained so as to be able to resolve any player disputes arising as a result of timing issues. It must be possible to display the audit log on the site operator’s premises.

The Commission does not intend to set out exact requirements for time stamping of significant events as it is considered better that the manufacturer do so on the basis of the overall system design.

Previous section
4 - Specific error conditions and alert requirements - Bingo technical requirements
Next section
6 - Bingo tickets - Bingo technical requirements
Is this page useful?
Back to top